SDLC/SEPM MCQs based on UML, Extreme Programming, Agility, Development Models

Hello Everyone!


The MCQs are based on basics of Software Project Management. The topics included are UML Diagrams, SRS (Software Requirements Specification), Software Development Models, Agility, Scrum and Extreme Programming. These are the general topics in Software Development Life Cycle (SDLC), also known as Software Engineering and Project Management (SEPM).



Q 1) What is a collection of operations that specify a service of a class or component?

a. Use case
b. Actor
c. Interface
d. Relationship

Solution: c) Interface


Q 2) What is an object?

a. An object is an instance of a class
b. An object includes encapsulation of data
c. An object is not an instance of a class
d. All of the mentioned

Solution: a) An object is an instance of a class


Q 3) Every task that is scheduled should be assigned to a specific team member is termed as ______.

a. Defined outcomes
b. Defined milestones
c. Defined responsibilities
d. None of the above

Solution: c) Defined responsibilities


Q 4) Which is a software configuration management concept that helps us to control change without seriously impeding justifiable change?

a. Baselines
b. Source codes
c. Data model
d. None of the above

Solution: b) Source codes


Q 5) Which of the following is not a software configuration management activity?

a. Configuration item identification
b. Risk management
c. Release management
d. Branch management

Solution: b) Risk management


Q 6) Which one of the following is not a maintenance model?

a. Waterfall model
b. Reuse-oriented model
c. Iterative enhancement model
d. Quick fix model

Solution: a) Waterfall model


Q 7) Which of the following is not a version management feature?

a. Version and release identification
b. Build script generation
c. Project support
d. Change history recording

Solution: b) Build script generation


Q 8) Which of the following is a collection of component versions that make up a system?

a. Version
b. Codeline
c. Baseline
d. None of the above

Solution: c) Baseline


Q 9) A project usually has a timeline chart which was developed by _____.

a. Henry Gantt
b. Barry Boehm
c. Ivar Jacabson
d. None of the above

Solution: a) Henry Gantt


Q 10) What complements the formal technical review by assessing a configuration object for characteristics that are generally not considered during review?

a. Software configuration audit
b. Software configuration management
c. Baseline
d. None of the above

Solution: a) Software configuration audit


Q 11) Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?

a. Software Macroscopic schedule
b. Software Project scheduling
c. Software Detailed schedule
d. None of the above

Solution: d) None of the above


Q 12) Which of the following is a configuration item?

a. Design and Test specification
b. Source code
c. Log information
d. All of the above

Solution: d) All of the above


Q 13) Which things are dynamic parts of UML models?

a. Structural things
b. Behavioral things
c. Grouping things
d. Annotational things

Solution: b) Behavioral things


Q 14) Who identifies, documents and verifies that corrections have been made to the software?

a. Project manager
b. Project team
c. SQA group
d. All of the above

Solution: c) SQA group


Q 15) Classes and interfaces are part of _____.

a. Structural things
b. Behavioral things
c. Grouping things
d. Annotational things

Solution: a) Structural things


Q 16) CMM stands for _______.

a. Capability Management Module
b. Conservative Maturity Model
c. Capability Maturity Module
d. Capability Maturity Model

Solution: d) Capability Maturity Model


Q 17) What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project?

a. Task set
b. Degree of milestone
c. Adaptation criteria
d. All of the mentioned.

Solution: a) Task set


Q 18) Which of the following is the reason that software is delivered late?

a. Changing customer requirements that are not reflected in schedule changes
b. Technical difficulties that could not have been foreseen in advance
c. Human difficulties that could not have been foreseen in advance
d. All of the above

Solution: d) All of the above


Q 19) Which of the following is not tracked by configuration management tools?

a. Tracking of changed proposals
b. Storing versions of system components
c. Tracking the releases of system versions to customers
d. None of the mentioned

Solution: d) None of the mentioned


Q 20) What is not included in the prevention costs?

a. Quality planning
b. Formal technical reviews
c. Test equipment
d. Equipment calibration and maintenance

Solution: d) Equipment calibration and maintenance


PAGE 1  |  PAGE 2  |  PAGE 3  |  PAGE 4

Comments

Popular posts from this blog

UML - Use Case Diagram for Vending Machine

Hello Everyone! Here is an example of an Use case Diagram of a Vending Machine System. Problem Statement - A vending machine accepts coins for variety of products. The user selects the drinks from products available through selection panel. If the drink is available the price of the product is displayed. The user then deposits the coins depending on the price of the product. Coin collector collects coin after stipulated time the controller will compare the deposited coin with price. If amount deposited is less than price then error message will be displayed and all deposited coin will be dispensed by the coin dispenser else the drink will be dispensed by the product dispenser. Check out other UML (Unified Modeling Language) Diagrams - Class Diagram   Object Diagram   Sequence Diagram Collaboration Diagram   Activity Diagram   State Diagram   Component Diagram   Deployment Diagram  

UML - Component Diagram for Intranet development of a college/school

Hello Everyone! Here is an example of an Component Diagram for Intranet development. Problem Statement - An intranet is a computer network for sharing information, collaboration tools, operational systems, and other computing services only within an organization. An Internet Service Provider (ISP) provides LAN services, Application services, Email services, Domain and Web hosting services to an organization. The LAN service is provided through Switch to the terminals using Ethernet and other cables. The firewall feature is provided for web applications through Application services. All the students and staff members are provided with an official email account through email services. The college has its own domain and web hosting package provided by the ISP. All these services maintain a database which is stored on server. The database server and all the services are controlled and handled by the Administrator of the college. Check out other UML (Unified Modeling Language)...

Connecting GitHub with Jenkins - Step by step Tutorial

Hello Everyone, In this tutorial, we will learn how to create a New Item (Project), connect Git and GitHub to Jenkins and run the files from the Git repository on Jenkins. Jenkins is an open-source automation tool written in Java with plugins built for Continuous Integration purposes. Jenkins is used to build and test your software projects continuously making it easier for developers to integrate changes to the project, and making it easier for users to obtain a fresh build. Facing trouble with the installation of Jenkins? Click here to know more. NOTE: It is mandatory to install plugins for Git and GitHub before connecting your GitHub repository to Jenkins. If you're using Jenkins for the first time, you need to install the plugins. To know more about these plugins, check out Git and GitHub Plugins for Jenkins . This tutorial demonstrates executing python code which requires separate plugins. Know more about Python Plugi...