The MCQs are based on basics of Software Project Management. The topics included are UML Diagrams, SRS (Software Requirements Specification), Software Development Models, Agility, Scrum and Extreme Programming. These are the general topics in Software Development Life Cycle (SDLC), also known as Software Engineering and Project Management (SEPM).



Q 1) What is a collection of operations that specify a service of a class or component?

a. Use case
b. Actor
c. Interface
d. Relationship

Solution: c) Interface


Q 2) What is an object?

a. An object is an instance of a class
b. An object includes encapsulation of data
c. An object is not an instance of a class
d. All of the mentioned

Solution: a) An object is an instance of a class


Q 3) Every task that is scheduled should be assigned to a specific team member is termed as ______.

a. Defined outcomes
b. Defined milestones
c. Defined responsibilities
d. None of the above

Solution: c) Defined responsibilities


Q 4) Which is a software configuration management concept that helps us to control change without seriously impeding justifiable change?

a. Baselines
b. Source codes
c. Data model
d. None of the above

Solution: b) Source codes


Q 5) Which of the following is not a software configuration management activity?

a. Configuration item identification
b. Risk management
c. Release management
d. Branch management

Solution: b) Risk management


Q 6) Which one of the following is not a maintenance model?

a. Waterfall model
b. Reuse-oriented model
c. Iterative enhancement model
d. Quick fix model

Solution: a) Waterfall model


Q 7) Which of the following is not a version management feature?

a. Version and release identification
b. Build script generation
c. Project support
d. Change history recording

Solution: b) Build script generation


Q 8) Which of the following is a collection of component versions that make up a system?

a. Version
b. Codeline
c. Baseline
d. None of the above

Solution: c) Baseline


Q 9) A project usually has a timeline chart which was developed by _____.

a. Henry Gantt
b. Barry Boehm
c. Ivar Jacabson
d. None of the above

Solution: a) Henry Gantt


Q 10) What complements the formal technical review by assessing a configuration object for characteristics that are generally not considered during review?

a. Software configuration audit
b. Software configuration management
c. Baseline
d. None of the above

Solution: a) Software configuration audit


Q 11) Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?

a. Software Macroscopic schedule
b. Software Project scheduling
c. Software Detailed schedule
d. None of the above

Solution: d) None of the above


Q 12) Which of the following is a configuration item?

a. Design and Test specification
b. Source code
c. Log information
d. All of the above

Solution: d) All of the above


Q 13) Which things are dynamic parts of UML models?

a. Structural things
b. Behavioral things
c. Grouping things
d. Annotational things

Solution: b) Behavioral things


Q 14) Who identifies, documents and verifies that corrections have been made to the software?

a. Project manager
b. Project team
c. SQA group
d. All of the above

Solution: c) SQA group


Q 15) Classes and interfaces are part of _____.

a. Structural things
b. Behavioral things
c. Grouping things
d. Annotational things

Solution: a) Structural things


Q 16) CMM stands for _______.

a. Capability Management Module
b. Conservative Maturity Model
c. Capability Maturity Module
d. Capability Maturity Model

Solution: d) Capability Maturity Model


Q 17) What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project?

a. Task set
b. Degree of milestone
c. Adaptation criteria
d. All of the mentioned.

Solution: a) Task set


Q 18) Which of the following is the reason that software is delivered late?

a. Changing customer requirements that are not reflected in schedule changes
b. Technical difficulties that could not have been foreseen in advance
c. Human difficulties that could not have been foreseen in advance
d. All of the above

Solution: d) All of the above


Q 19) Which of the following is not tracked by configuration management tools?

a. Tracking of changed proposals
b. Storing versions of system components
c. Tracking the releases of system versions to customers
d. None of the mentioned

Solution: d) None of the mentioned


Q 20) What is not included in the prevention costs?

a. Quality planning
b. Formal technical reviews
c. Test equipment
d. Equipment calibration and maintenance

Solution: d) Equipment calibration and maintenance


PAGE 1  |  PAGE 2  |  PAGE 3  |  PAGE 4

Comments

Popular posts from this blog

50 + Interview Questions/Experiences of TCS DCA April 2021

Hello Everyone! This post is dedicated to the Interview Questions asked in TCS DCA. DCA which is Digital Capability Assessment is usually conducted for the internal employees of TCS who are selected for the Ninja profile. If DCA is cleared successfully, then the candidates are offered Digital profile. That means the profile changes from Assistant System Engineer to System Engineer . This year i.e., in 2021, TCS conducted DCA for the candidates who have received offer letter but not joined TCS as an employee yet. The original DCA which is conducted for internal employees has a different pattern and is not discussed in this post. Rather this post is dedicated to the DCA conducted in March and April 2021 for 2021 recruits. The DCA was conducted on 19 th and 20 th March 2021. The test had two coding questions. To sucessfully clear DCA, all the test cases of both the codes must be passed. In March DCA, a lot of students faced compile...

UML - Object Diagram for Hospital Management System

Hello Everyone! Here is an example of an Object Diagram for Hospital Management System. Problem Statement - The hospital wishes to maintain a database to assist with the administration of its wards and operating theatre and to maintain information related to its patients, surgeons and nurse. Most patients are assigned to a ward on admittance and each ward may contain many patients. However, consultants (senior surgeons) in the hospital may have private patients who are assigned to private room. A nurse may or may not be assigned to a ward and she cannot be assigned to more than one ward. A ward may have many nurses assigned to it. Each ward is dedicated to a particular type of patient. A nurse may or may not be assigned to a theatre and she cannot be assigned more than one theatre. Theatre may have many nurses assigned to it. A patient may have number of operations. The information to be recorded about the operation includes the type of operation, the patients, the surgeons involv...

UML - Activity Diagram for Vending Machine

Hello Everyone! Here is an example of an Activity Diagram of a Vending Machine. Problem Statement - A vending machine accepts coins for a variety of products. The user selects the drink from products available through selection panel. If the drink is available the price of the product will be displayed. The user then deposits the coins depending on the price of the product. Coin collector collects coin after stipulated time. The controller will compare the deposited coins with the price. If amount is less than the price then an error message will be displayed and all deposited coins will be dispensed by the dispenser. Otherwise the drink will be displayed by the drink dispenser. Check out other UML (Unified Modeling Language) Diagrams - Use Case Diagram   Class Diagram   Object Diagram   Sequence Diagram Collaboration Diagram   State Diagram   Component Diagram   Deployment Diagram