SDLC/SEPM MCQs based on UML, Extreme Programming, Agility, Development Models

Hello Everyone!


The MCQs are based on basics of Software Project Management. The topics included are UML Diagrams, SRS (Software Requirements Specification), Software Development Models, Agility, Scrum and Extreme Programming. These are the general topics in Software Development Life Cycle (SDLC), also known as Software Engineering and Project Management (SEPM).



Q 1) Which view in architectural design shows the key abstraction in the system as objects or classes?

a. Physical
b. Development
c. Logical
d. Process

Solution: c) Logical


Q 2) What describes the data and control to be processed?

a. Planning process
b. Software scope
c. External hardware
d. Project complexity

Solution: b) Software scope


Q 3) Which of the following is a building block of UML?

a. Things
b. Relationships
c. Diagrams
d. All of the mentioned

Solution: d) All of the mentioned


Q 4) The UML was designed for describing _____.

a. Object oriented systems
b. Architectural design
c. SRS
d. Both object oriented systems and Architecture design

Solution: d) Both object oriented systems and Architecture design


Q 5) Which of the following process ensures that version of systems and components are recorded and maintained?

a. Codeline
b. Configuration control
c. Version
d. Workspace

Solution: b) Configuration control


Q 6) Which diagram in UML emphasizes the time-ordering of messages?

a. Activity
b. Sequence
c. Collaboration
d. Class

Solution: b) Sequence


Q 7) Which requirements are the foundation from which quality is measured?

a. Hardware
b. Software
c. Programmers
d. None of the above

Solution: b) Software


Q 8) Which of the following is an important factor that can affect the accuracy and efficacy of estimates?

a. Project size
b. Planning process
c. Project complexity
d. Degree of structural uncertainty

Solution: a) Project size


Q 9) Which of the following categories is part of the output of the software process?

a. Computer programs
b. Documents that describe the computer programs
c. Data
d. All of the above

Solution: d) All of the above


Q 10) What combines procedures and tools to manage different versions of configuration objects that are created during the software process?

a. Change control
b. Version control
c. SCIs
d. None of the above

Solution: b) Version control


Q 11) Which of the following are the valid relationships is use case diagrams?

a. Generalization
b. Include
c. Extend
d. All of the above

Solution: d) All of the above


Q 12) Which of the following is not an adaptation criteria for software projects?

a. Size of projects
b. Customers complaints
c. Project staff
d. Mission criticality

Solution: b) Customers complaints


Q 13) Which of the following is not a SQA plan for a project?

a. Evaluation to be performed
b. Amount of technical work
c. Audits and reviews to be performed
d. Documents to be produced by the SQA group

Solution: b) Amount of technical work


Q 14) What evaluates the risk associated with the technology to be implemented as part of project scope?

a. Concept scoping
b. Preliminary concept planning
c. Technology risk assessment
d. Customer reaction to the concept

Solution: b) Preliminary concept planning


Q 15) Which of the following processes is concerned with analyzing the costs and the benefits of proposed changes?

a. Change management
b. Version management
c. System building
d. Release management

Solution: a) Change management


Q 16) Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems?

a. Agile method
b. Parallel compilation method
c. Large systems method
d. All of the mentioned

Solution: a) Agile method


Q 17) A sequence of baselines representing different versions of a system is known as ______.

a. System building
b. Mainline
c. Software Configuration Item (SCI)
d. None of the mentioned

Solution: b) Mainline


Q 18) Architectural design is a creative process satisfying only functional requirements of a system.

a. True
b. False

Solution: b) False


Q 19) Software configuration management can be administered in several ways. These include ____.

a. A single software configuration management team for the whole organization
b. A separate configuration management team for each project
c. Software Configuration distribution among the project members
d. All of the mentioned

Solution: a) A single software configuration management team for the whole organization


Q 20) Which of the following is not a maturity level in CMM?

a. Design
b. Repeat
c. Managed
d. Optimizing

Solution: c) Managed


PAGE 1  |  PAGE 2  |  PAGE 3  |  PAGE 4

Comments

Popular posts from this blog

50 + Interview Questions/Experiences of TCS DCA April 2021

Hello Everyone! This post is dedicated to the Interview Questions asked in TCS DCA. DCA which is Digital Capability Assessment is usually conducted for the internal employees of TCS who are selected for the Ninja profile. If DCA is cleared successfully, then the candidates are offered Digital profile. That means the profile changes from Assistant System Engineer to System Engineer . This year i.e., in 2021, TCS conducted DCA for the candidates who have received offer letter but not joined TCS as an employee yet. The original DCA which is conducted for internal employees has a different pattern and is not discussed in this post. Rather this post is dedicated to the DCA conducted in March and April 2021 for 2021 recruits. The DCA was conducted on 19 th and 20 th March 2021. The test had two coding questions. To sucessfully clear DCA, all the test cases of both the codes must be passed. In March DCA, a lot of students faced compile...

UML - Object Diagram for Hospital Management System

Hello Everyone! Here is an example of an Object Diagram for Hospital Management System. Problem Statement - The hospital wishes to maintain a database to assist with the administration of its wards and operating theatre and to maintain information related to its patients, surgeons and nurse. Most patients are assigned to a ward on admittance and each ward may contain many patients. However, consultants (senior surgeons) in the hospital may have private patients who are assigned to private room. A nurse may or may not be assigned to a ward and she cannot be assigned to more than one ward. A ward may have many nurses assigned to it. Each ward is dedicated to a particular type of patient. A nurse may or may not be assigned to a theatre and she cannot be assigned more than one theatre. Theatre may have many nurses assigned to it. A patient may have number of operations. The information to be recorded about the operation includes the type of operation, the patients, the surgeons involv...

UML - Activity Diagram for Vending Machine

Hello Everyone! Here is an example of an Activity Diagram of a Vending Machine. Problem Statement - A vending machine accepts coins for a variety of products. The user selects the drink from products available through selection panel. If the drink is available the price of the product will be displayed. The user then deposits the coins depending on the price of the product. Coin collector collects coin after stipulated time. The controller will compare the deposited coins with the price. If amount is less than the price then an error message will be displayed and all deposited coins will be dispensed by the dispenser. Otherwise the drink will be displayed by the drink dispenser. Check out other UML (Unified Modeling Language) Diagrams - Use Case Diagram   Class Diagram   Object Diagram   Sequence Diagram Collaboration Diagram   State Diagram   Component Diagram   Deployment Diagram